Kennedale Waste Operations East
City of Edmonton
Edmonton, AB

Al-Terra prepared the site grading, servicing, and roadway design for a 3.3 hectare expansion to the existing waste management facilities. Storm sewer installation was minimized through the use of bioswales, which also provide onsite stormwater storage. Significant savings on earthworks costs were realized using geotextile and geogrid, plus minimal extra gravel over existing marginal soils, avoiding complete removal and replacement of these materials. The site grading design was integrated with the existing site and buildings.