Rampart Industrial Division
City of Edmonton
Edmonton, AB

Al-Terra was retained by the City of Edmonton to provide engineering services for this 130-hectare industrial development in west Edmonton. The design had to consider many environmental aspects as Stage 1 included the preservation of a large natural area for dedication to the Crown. An eight-hectare wetland was constructed for a stormwater management facility, which is adjacent to the natural area and linked to a woodland park with a naturally vegetated ditch (bioswale). The bioswale treats overland surface flows from two of the industrial parcels.