Sterling Crane
Procor Industrial
Edmonton, AB

Procor purchased a 4.0 hectare parcel to expand their storage yard, which included both Gold Bar Creek and a tributary that meandered through the site. Through negotiations with Alberta Environment and the City of Edmonton, plus a careful hydrological assessment, Al-Terra implemented the relocation and straightening of the watercourses, resulting in a functional, connected yard. Also, the use of crushed concrete on geotextile resulted in a very stable structure for the heavy loads using the yard.