Glenora Neighbourhood Renewal

Al-Terra was engaged by the City of Edmonton on the Glenora Neighbourhood Renewal project. Field review and reconnaissance were conducted to assess the condition of the existing sidewalk, curb and gutter. The team undertook the review and design of geometrics to improve roadway safety, minimize impact on utilities and on adjacent land owners.

The Public Consultation process were carried out, including dealing with the 50/50 Local Improvement. Design grades were developed to improve the existing substandard road grades without adversely affecting grades of adjacent lots and landscaping. Al-Terra, the City, and the Contractor maintained good communication with the residents to address additional issues not addressed in the Public Consultation process. Numerous options and innovative designs were developed for problematic locations to minimize reconstruction of roadways within the neighbourhood.